New regulations issued by the State Water Resources Control Board (SWRCB) now require that SWPPPs determine site specific erosion risks, are prepared by a Qualified SWPPP Developer (QSD), and monitored by a Qualified SWPPP Practitioner (QSP). Rincon Consultants assists clients with:

  • Preparation of SWPPPs following the Construction General Permit
  • Preparation of SWPPPs following the General Industrial Permit
  • Design Best Management Practices (BMP) and treatment control BMPs
  • Low Impact Development (LID) - sustainable storm water management
  • Preparation and electronic filing of Permit Registration Documents (PRDs) and SWPPPs
  • Construction crew training
  • Site inspections and monitoring
  • Storm water collection and analysis
  • Risk Assessment determination
  • Bioassessment monitoring

Representative Projects

Rincon Consultants has prepared SWPPPs following the Construction General Permit or General Industrial Permit for the following projects: